County surveyor to cause roads to be repaired in case of neglect on the part of contractor.
|
54. Provided always, that in case it shall appear to the county surveyor, at any time during the continuance of any contract now made or hereafter to be made for keeping any road in repair, that such road is not in proper repair, he shall require the contractor to put the same in repair, and if such contractor shall neglect to do so within ten days after he shall have been so required, such surveyor shall cause the same to be repaired, and the expense thereof shall be deducted and paid out of the sum which would be payable to such contractor if the road had been kept in proper repair.
|