| |
“(5) Where subsection (1) applies, the application for the development permission referred to in that subsection shall have attached to it the rehabilitation schedule (within the meaning of section 95) that would otherwise have been required to be attached to the MAC referred to in that subsection but for the operation of section 96(5).”.
|