Updated to 20 January 2026 (Act No. 21 of 2025 and S.I. No. 16 of 2026)
The effects marked with a red background are not reflected in the most recent Revised Act. To scroll to next the unapplied effect(s), click here.
National Oil Reserves Agency Act 2007
No. 7 of 2007
Contents
Commencement
| Section | Commencement/Effective Date Where the commencement and effective dates differ, the effective date is shown below.
|
Commencement Information |
|---|---|---|
| Ss. 1- 6 | 16 April 2007 | National Oil Reserves Agency Act 2007 (Parts 1 and 2)(Commencement) Order 2007 (S.I. No 153 of 2007), art. 2 |
| Ss. 7 - 67 | 1 August 2007 | National Oil Reserves Agency Act 2007 (Remaining Provisions) (Commencement) Order 2007 (S.I. No. 565 of 2007), art. 2 |
Amendments and other effects
| How Affected | Affecting Provision | Affecting Provision Commencement/Effective Date
Where the commencement and effective dates differ, the effective date is shown below.
|
Commencement Source |
|---|---|---|---|
| Act included in collectively cited Nation Oil Reserves Agency Acts | Oil Emergency Contingency and Transfer of Renewable Transport Fuels Functions Act 2023 (2/2023), s. 1(3) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| Transfer of certain functions under | Oil Emergency Contingency and Transfer of Renewable Transport Fuels Functions Act 2023 (2/2023), ss. 1(2), 23-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| Finance (Transfer of Departmental Administration and Ministerial Functions) Order 2011 (S.I. No. 418 of 2011), arts. 1(2), 3 & sch. 1 | 29 July 2011 | Finance (Transfer of Departmental Administration and Ministerial Functions) Order 2011 (S.I. No. 418 of 2011), art. 1(2) | |
| S. 2 amended | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1), 3(a) | 1 January 2024 | European Union (Renewable Energy) Regulations 2023, reg. 2(1) |
| Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 3(a), (b) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 | |
| National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 4 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 | |
| European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), regs. 2, 5 | 1 January 2020 | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), reg. 2 | |
| European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 5 | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) | |
| European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 10 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) | |
| S. 2 defs. "biofuel", "biofuel levy", "biofuel obligation", "biofuel producer", "biofuel supplier" inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(3), 4(a) | 9 June 2010 | Commenced as per s. 1(3) |
| S. 2 def. "prescribed" substituted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(3), 4(b) | 9 June 2010 | Commenced as per s. 1(3) |
| S. 8(1)(c) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 5(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 8(1)(ca) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(3), 5 | 9 June 2010 | Commenced as per s. 1(3) |
| S. 8(1)(cb) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(3), 5 | 9 June 2010 | Commenced as per s. 1(3) |
| S. 8(3)(i) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 5(b)(i) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 8(3)(j) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 5(b)(ii) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 8(3)(k) inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 5(b)(iii) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 13(2) application restricted | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025), reg. 6(3) | 7 August 2025 | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025) |
| S. 14(3)(aa) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 6(a) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) |
| S. 14(8) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 6 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 15(3A) inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 4 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 16(12) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 7 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 7 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) | |
| S. 18(2) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 8 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 8 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) | |
| S. 19(4) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 9 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 9 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) | |
| S. 21(3) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 10 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 10 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) | |
| S. 24 saver from disclosure | Freedom of Information Act 2014 (No. 30 of 2014), ss. 1(2), (3), 41, sch. 3 | 14 October 2014 | Commenced on enactment |
| S. 26 transfer of certain functions under | Ministers and Secretaries (Amendment) Act 2011 (No. 10 of 2011), ss. 1(2), 6, 9, 20 & sch. 2 pt. 1 | 6 July 2011 | Ministers and Secretaries (Amendment) Act 2011 (Appointed Day) Order 2011 (S.I. No. 401 of 2011), art. 2 |
| S. 26(4) repealed | European Communities (Repeal of Section 26(4) of the National Oil Reserves Agency Act 2007) Regulations 2009 (S.I. No. 247 of 2009), reg. 2 | 30 June 2009 | European Communities (Repeal of Section 26(4) of the National Oil Reserves Agency Act 2007) Regulations 2009 (S.I. No. 247 of 2009) |
| S. 27 transfer of certain functions under | Ministers and Secretaries (Amendment) Act 2011 (No. 10 of 2011), ss. 1(2), 6, 9, 20 & sch. 2, pt. 1 | 6 July 2011 | Ministers and Secretaries (Amendment) Act 2011 (Appointed Day) Order 2011 (S.I. No. 401 of 2011), art. 2 |
| S. 28(1) amended | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 5(a) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 28(2A) inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 5(a) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 29(3A) inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 6 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 30(3), (4) inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 7 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 31A inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 11(1) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) |
| S. 31A(2)(a)(i) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 11 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 32(1) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 13 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 32(1A) inserted | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 6(a) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 32(1B) inserted | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 6(b) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 32(1B)(c) amended | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), regs. 2, 6(a) | 1 January 2020 | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), reg. 2 |
| S. 32(1C) inserted | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 6(c) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 32(1C)(a) amended | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), reg. 2, 6(b) | 1 January 2020 | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), reg. 2 |
| S. 32(2) amended | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 6(d) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 33(2) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 12 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 33(3) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 12 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 34(1)(a) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 13 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 35 amended | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 7 | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 36 amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 12(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (11/2010), ss. 11(2), 12 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) | |
| S. 36(g) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 12(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 36(gb) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 12(c) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 37(1) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 13(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 37(1A) substituted | Electricity Costs (Domestic Electricity Accounts) Emergency Measures and Miscellaneous Provisions Act 2022 (32/2022), ss. 12, 13(2) | 18 October 2022 | Electricity Costs (Domestic Electricity Accounts) Emergency Measures and Miscellaneous Provisions Act 2022 (Commencement) Order 2022 (S.I. No. 520 of 2022), art. 2 |
| S. 37(1A) inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 13(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 37A inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 14 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 37B inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 15 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 37B(9)(ca), (cb) inserted | Climate Action and Low Carbon Development (Amendment) Act 2021 (32/2021), ss. 1(2), 20(a)(i) | 7 September 2021 | Climate Action and Low Carbon Development (Amendment) Act 2021 (Commencement) Order 2021 (S.I. No. 468 of 2021), art. 2 |
| S. 37B(9)(d)(iiI) substituted | Climate Action and Low Carbon Development (Amendment) Act 2021 (32/2021), ss. 1(2), 20(a)(ii) | 7 September 2021 | Climate Action and Low Carbon Development (Amendment) Act 2021 (Commencement) Order 2021 (S.I. No. 468 of 2021), art. 2 |
| S. 37B(9)(d)(iv)-(vi) inserted | Climate Action and Low Carbon Development (Amendment) Act 2021 (32/2021), ss. 1(2), 20(a)(ii) | 7 September 2021 | Climate Action and Low Carbon Development (Amendment) Act 2021 (Commencement) Order 2021 (S.I. No. 468 of 2021), art. 2 |
| s. 37B(9)(e)(iii) substituted | Climate Action and Low Carbon Development (Amendment) Act 2021 (32/2021), ss. 1(2), 20(a)(iii) | 7 September 2021 | Climate Action and Low Carbon Development (Amendment) Act 2021 (Commencement) Order 2021 (S.I. No. 468 of 2021), art. 2 |
| S. 37B(9)(e)(iv)-(vi) inserted | Climate Action and Low Carbon Development (Amendment) Act 2021 (32/2021), ss. 1(2), 20(a)(iii) | 7 September 2021 | Climate Action and Low Carbon Development (Amendment) Act 2021 (Commencement) Order 2021 (S.I. No. 468 of 2021), art. 2 |
| S. 37B(15) substituted | Climate Action and Low Carbon Development (Amendment) Act 2021 (32/2021), ss. 1(2), 20(b) | 7 September 2021 | Climate Action and Low Carbon Development (Amendment) Act 2021 (Commencement) Order 2021 (S.I. No. 468 of 2021), art. 2 |
| S. 38(2) substituted | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 11 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 38(2)(d) amended | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 8(a)(i) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 38(2)(e) substituted | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 8(a)(ii) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 38(2)(f) inserted | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 8(a)(iii) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 38(2)(g) inserted | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 8(a)(iv) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 38(2)(h) inserted | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 8(a)(v) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 38(2A) inserted | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 11 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 38(2A) amended | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 8(b) | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 40(2)(b) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 16 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 41(b) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 17 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 43A inserted | Energy Act 2016 (12/2016), ss. 1(2), 28 | 7 October 2016 | Energy Act 2016 (Commencement of Certain Provisions) Order 2016 (S.I. No. 509 of 2016), art. 2(d) |
| S. 43A(2) substituted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 8 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44(1)(a) deleted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 18(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44(1)(a) transfer of certain functions under | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), arts. 1(2), 3(a), schedule | 20 September 2011 | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), art. 1(2) |
| S. 44(1)(a) substituted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 13(a) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) |
| S. 44(1)(g) deleted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 13(b) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) |
| S. 44(2)-(6) deleted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 18(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44(7) amended | Central Bank Reform Act 2010 (No. 23 of 2010), ss. 2, 15(14), sch. 2, pt. 14, para. 27 | 1 October 2010 | Central Bank Reform Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 469 of 2010), art. 2 |
| Part 5A title amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(a) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022) |
| S. 44A amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(a)(i)-(v) | 1 January 2026 | (S.I. No. 664 of 2025), reg. 2 |
| European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1), 3(b)(i), (ii), (iii), (iv), (v), (vi), (vii) | 1 January 2024 | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1) | |
| European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(b) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(1) | |
| Energy Act 2016 (12/2016), ss. 1(2), 29 | 20 November 2016 | Energy Act 2016 (Commencement of Certain Provisions) (No. 2) Order 2016 (S.I. No. 572 of 2016), art. 2 | |
| S. 44A inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 9 June 2010 | Commenced as per s. 1(3) |
| S. 44A functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44B inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 9 June 2010 | Commenced as per s. 1(3) |
| S. 44B deleted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(c) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2). |
| S. 44B(3)(b)(ia) inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 19(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44B(3)(b)(ii) transfer of certain functions under | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), arts. 1(2), 3(a), schedule | 20 September 2011 | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), art. 1(2) |
| S. 44B(3)(b)(iii) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 19(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44C inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44C functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44C substituted | European Union (Renewable Energy) (Amendment) Regulations 2022 (S.I. No. 680 of 2022), reg. 3(1)(a) | 16 December 2022 | European Union (Renewable Energy) (Amendment) Regulations 2022 (S.I. No. 680 of 2022) |
| S. 44C amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(d)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg.1(2) |
| S. 44C(2) amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(d)(ii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg.1(2) |
| S. 44C(3) substituted | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1), 3(c)(i) | 1 January 2024 | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023) |
| S. 44C(3) amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(d)(ii). (iii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg.1(2) |
| S. 44C(3)(a) substituted | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(b)(i) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44C(3A) inserted | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), reg. 2, 3(b)(ii) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44C(4) inserted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(d)(iv) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg.1(2) |
| S. 44C(4) deleted | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1), 3(c)(i) | 1 January 2024 | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023) |
| S. 44C(5) deleted | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1), 3(c)(ii) | 1 January 2024 | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023) |
| S. 44D inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44D substituted | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(c) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| European Union (Renewable Energy) Regulations 2024 (S.I. No. 665 of 2024), regs. 2, 3 | 1 January 2025 | European Union (Renewable Energy) Regulations 2024 (S.I. No. 665 of 2024), reg. 2 | |
| European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1), 3(d) | 1 January 2024 | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023) | |
| European Union (Renewable Energy) (Amendment) Regulations 2022 (S.I. No. 680 of 2022), reg. 3(1)(b) | 16 December 2022 | European Union (Renewable Energy) (Amendment) Regulations 2022 (S.I. No. 680 of 2022) | |
| S. 44D functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44D application restricted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(2), (1)(e) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(e)(i), (ii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(1) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(e)(iii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(1)(b) deleted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(e)(iv) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(2)(a) obligation on Minister when making order under | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 4 | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(2)(a) amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(e)(v) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(2)(b) deleted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(e)(vi) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(3)(a) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(e)(vii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(3)(b) amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(e)(viii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(3)(c) amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(e)(ix) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44D(4)(b) substituted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 9 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44D(4)(b)(i) transfer of certain functions under | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), arts. 1(2), 3(a), schedule | 20 September 2011 | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), art. 1(2) |
| S. 44D(4)(b)(ia) inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 20(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44D(4)(b)(ii) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 20(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44DA inserted | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(2), 3(e) | 31 December 2023 | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), reg.. 2(2) |
| S. 44E inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44E functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44E amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(f) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1(2) |
| S. 44F inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44F functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44F amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(g)(i), (ii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44G(1)-(3) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44G(1AA) inserted | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(d) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44G(4) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 2 February 2012 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Section 3) (Commencement) Order 2012 (S.I. No. 32 of 2012) |
| Ss. 44G(5)-(15) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44G functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44G amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), regs. 17(1)(h)(i), (ii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44G(1) amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(h)(iii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| Energy Act 2016 (12/2016), ss. 1(2), 30(a) | 20 November 2016 | Energy Act 2016 (Commencement of Certain Provisions) (No. 2) Order 2016 (S.I. No. 572 of 2016), art. 2 | |
| S. 44G(1)(a) amended | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 10(a)(i) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44G(1)(a) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(h)(iv) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44G(1)(b) amended | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 10(a)(ii) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44G(1)(b) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(h)(iv) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44G(1)(c) inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 10(a)(iii) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44G(1A) inserted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(h)(v) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44G(1A)(1) renumbered and substituted as (1A) | European Union (Renewable Energy) (Amendment) Regulations 2022 (S.I. No. 680 of 2022), reg. 3(1)(c) | 16 December 2022 | European Union (Renewable Energy) (Amendment) Regulations 2022 (S.I. No. 680 of 2022) |
| S. 44G(1B) inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 10(b) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44G(2A) inserted | Energy Act 2016 (12/2016), ss. 1(2), 30(b) | 20 November 2016 | Energy Act 2016 (Commencement of Certain Provisions) (No. 2) Order 2016 (S.I. No. 572 of 2016), art. 2 |
| S. 44G(2B) inserted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(h)(vi) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44G(3) substituted | Energy Act 2016 (12/2016), ss. 1(2), 30(c) | 20 November 2016 | Energy Act 2016 (Commencement of Certain Provisions) (No. 2) Order 2016 (S.I. No. 572 of 2016), art. 2 |
| S. 44G(4)(a) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(h)(vii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014), reg. 26 | 23 October 2014 | European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014) | |
| S. 44G(4)(b) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(h)(vii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014), reg. 26 | 23 October 2014 | European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014) | |
| S. 44G(11)(a) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(h)(viii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44G(11)(b)(iv) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 21 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44GA inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 11 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44H inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44H functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44H amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(i)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44H(1) substituted | Energy Act 2016 (12/2016), ss. 1(2), 31(a) | 20 November 2016 | Energy Act 2016 (Commencement of Certain Provisions) (No. 2) Order 2016 (S.I. No. 572 of 2016), art. 2 |
| S. 44H(2) deleted | Energy Act 2016 (12/2016), ss. 1(2), 31(b) | 20 November 2016 | Energy Act 2016 (Commencement of Certain Provisions) (No. 2) Order 2016 (S.I. No. 572 of 2016), art. 2 |
| S. 44H(3A) inserted | Energy Act 2016 (12/2016), ss. 1(2), 31(c) | 20 November 2016 | Energy Act 2016 (Commencement of Certain Provisions) (No. 2) Order 2016 (S.I. No. 572 of 2016), art. 2 |
| S. 44I inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44I functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44I amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), regs. 17(1)(j)(i), (ii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| Energy Act 2016 (12/2016), ss. 1(2), 32 | 20 November 2016 | Energy Act 2016 (Commencement of Certain Provisions) (No. 2) Order 2016 (S.I. No. 572 of 2016), art. 2 | |
| S. 44I(1) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(j)(iii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44I(1) amended | Energy (Miscellaneous Provisions) Act 2012 (No. 3 of 2012), ss. 1(2), 21(2)(a) | 16 April 2012 | Energy (Miscellaneous Provisions) Act 2012 (Commencement) Order 2012 (S.I. No. 122 of 2012), art. 2 |
| S. 44I(1)(b) amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(e)(i)(I) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44I(1)(c) amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(e)(i)(II) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44I(2) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(j)(iii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44I(2A) inserted | European Union (Renewable Energy) (Amendment) Regulations 2022 (S.I. No. 680 of 2022), reg. 3(1)(d) | 16 December 2022 | European Union (Renewable Energy) (Amendment) Regulations 2022 (S.I. No. 680 of 2022) |
| S. 44I(3) amended | Energy (Miscellaneous Provisions) Act 2012 (No. 3 of 2012), ss. 1(2), 21(2)(b) | 16 April 2012 | Energy (Miscellaneous Provisions) Act 2012 (Commencement) Order 2012 (S.I. No. 122 of 2012), art. 2 |
| S. 44I(6)(a) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 22(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44I(6)(b) amended | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 22(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44I(6)(c) inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 22(c) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44I(6)(c) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(j)(iv) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44I(6)(d) inserted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(j)(v) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44I(6)(e) amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(e)(ii) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44I(6)(e) inserted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(j)(v) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44J inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44J functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44J amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), regs. 17(1)(k)(i), (ii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44J application restricted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(3), 1(k) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44J(1) amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(f)(i) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(k)(iii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 | |
| S. 44J(2) amended | Energy (Miscellaneous Provisions) Act 2012 (No. 3 of 2012), ss. 1(2), 21(3) | 16 April 2012 | Energy (Miscellaneous Provisions) Act 2012 (Commencement) Order 2012 (S.I. No. 122 of 2012), art. 2 |
| S. 44J(2)(a) amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(f)(ii)(I) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44J(2)(b) substituted | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), reg. 2, 3(f)(ii)(II) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44J(5)(a) transfer of certain functions under | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), arts. 1(2), 3(a), schedule | 20 September 2011 | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011) |
| S. 44J(5)(a)(iii) amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(f)(iii)(I) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44J(5)(a)(iii) substituted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(k)(iv) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44J(5)(c) amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(k)(v) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44J(5)(d) amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(f)(iii)(II) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44J(5)(d) inserted | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(k)(vi) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44J(7)(a)(ii) amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(k)(vii) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44J(7)(b) substituted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 12 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44J(7)(b)(i) transfer of certain functions under | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), arts. 1(2), 3(a), schedule | 20 September 2011 | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011) |
| S. 44J(7)(b)(ia) inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 23(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44J(7)(b)(ii) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 23(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44K inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44K functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44K amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44K(2A) inserted | Energy (Miscellaneous Provisions) Act 2012 (No. 3 of 2012), ss. 1(2), 21(4) | 16 April 2012 | Energy (Miscellaneous Provisions) Act 2012 (Commencement) Order 2012 (S.I. No. 122 of 2012), art. 2 |
| S. 44K(6) amended | European Union (Renewable Transport Fuel Obligation) Regulations 2025 (S.I. No. 664 of 2025), regs. 2, 3(g) | 1 January 2026 | S.I. No. 664 of 2025, reg. 2 |
| S. 44L inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44L functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44L amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44M inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44M functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44M amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44M(1)(ca) inserted | Energy (Miscellaneous Provisions) Act 2012 (No. 3 of 2012), ss. 1(2), 21(5) | 16 April 2012 | Energy (Miscellaneous Provisions) Act 2012 (Commencement) Order 2012 (S.I. No. 122 of 2012), art. 2 |
| S. 44N inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44N functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44N amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44N(1A) inserted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 24 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44O inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44O amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44P inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44P amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44P(2)(b) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 25 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44Q inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44Q functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44Q amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44Q(b) substituted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 26 | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44R inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44R functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44R amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44S inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44S functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44S amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44T inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44T functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44T amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44T(1) transfer of certain functions under | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), arts. 1(2), 3(a), schedule | 20 September 2011 | Finance (Transfer of Departmental Administration and Ministerial Functions) (No. 2) Order 2011 (S.I. No. 480 of 2011), art. 1(2) |
| S. 44T(1)(a) deleted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 27(a) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44T(2) deleted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 27(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44T(3) deleted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 27(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| S. 44T(4) deleted | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (6/2020), ss. 1(2), 27(b) | 1 August 2020 | National Oil Reserves Agency (Amendment) and Provision of Central Treasury Services Act 2020 (Commencement) Order 2020 (S.I. No. 280 of 2020), art. 2 |
| Ss. 44U inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44U amended | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 13 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 | |
| S. 44V inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44V functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23(a)-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44W inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(a) |
| S. 44W functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44W amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| Ss. 44X inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2) & (3), 3 | 9 June 2010 | Commenced as per s.. 1(3) |
| S. 44X functions transferred and references construed | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 23-29 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44X amended | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 17(1)(l)(i) | 15 July 2022 | European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 1 |
| S. 44Y inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 14 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 44Y(2) amended | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1), 3(f) | 31 December 2023 | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), reg. 2(1) |
| S. 45(b) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 12 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 46 applied with modifications | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025), reg. 6(4)(a) | 7 August 2025 | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025) |
| S. 46(1)(b) amended | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 15(a)(i) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 46(1)(c) substituted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 15(a)(ii) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 46(4)(b) amended | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 15(b) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 46(6)(ba) inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 15(c) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 47(1) applied with modifications | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025), reg. 6(4)(b) | 7 August 2025 | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025) |
| S. 47(1) amended | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 16(a) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 12 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) | |
| S. 47(1)(g) amended | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 15(b) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(b) |
| S. 47(2) substituted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 16(b) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 47(2A) inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 16(c) | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 48 applied with modifications | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025), reg. 6(4)(c) | 7 August 2025 | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025) |
| S. 51 applied with modifications | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025), reg. 6(4)(d) | 7 August 2025 | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025) |
| S. 58(1) amended | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 17 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 58A amended | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1), 3(g) | 1 January 2024 | European Union (Renewable Energy) Regulations 2023 (S.I. No. 693 of 2023), regs. 2(1) |
| S. 58A inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 18 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 59(1)(b) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 12 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 59A inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(3), 16 | 9 June 2010 | Commenced as per s. 1(3) |
| S. 62(1) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 12 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 62(1), obligation to enter specific stocks in register | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 9(2) | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 62(1)(a) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 13 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 62(4)(a) amended | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 12 | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 63 renumbered as s. 63(1) | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 17(a) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(c) |
| S. 63(2) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 17(b) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(c) |
| S. 64(1) substituted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 19 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 64(1)(a) substituted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 18(a) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(c) |
| S. 64(3) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 18(b) | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(c) |
| S. 67 applied with modifications | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025), reg. 6(4)(e) | 7 August 2025 | European Union (Refueleu Aviation) (Competent Authorities) Regulations 2025 (S.I. No. 396 of 2025) |
| S. 67 applied | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012), reg. 8(2) | 19 December 2012 | European Union (Oil Reserves) Regulations 2012 (S.I. No. 541 of 2012) |
| S. 67(1)(da) inserted | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (No. 11 of 2010), ss. 1(2), 19 | 1 July 2010 | Energy (Biofuel Obligation and Miscellaneous Provisions) Act 2010 (Commencement of Certain Provisions) Order 2010 (S.I. No. 322 of 2010), art. 3(c) |
| S. 68 inserted | Energy (Miscellaneous Provisions) Act 2012 (No. 3 of 2012), ss. 1(2), 21(6) | 16 April 2012 | Energy (Miscellaneous Provisions) Act 2012 (Commencement) Order 2012 (S.I. No. 122 of 2012), art. 2 |
| S. 68 substituted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 20 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| S. 69 inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 21 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| Schedules 1-3 inserted | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016), reg. 9 | 29 April 2016 | European Union (Oil Reserves) (Amendment) Regulations 2016 (S.I. No. 231 of 2016) |
| S. 70 inserted | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (2/2023), ss. 1(2), 22 | 28 February 2023 | Oil Emergency Contingency and Transfer of Renewable Transport Fuel Functions Act 2023 (Commencement) Order 2023 (S.I. No. 81 of 2023), art. 2 |
| Sch. 1 substituted | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), reg. 2, 7 | 1 January 2020 | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019) |
| Sch. 2, para. 1 subsituted | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), reg. 2, 8 | 1 January 2020 | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019) |
| Sch. 3, para. 5(a) substituted | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019), reg. 2, 9 | 1 January 2020 | European Union (Oil Reserves) (Amendment) Regulations 2019 (S.I. No. 557 of 2019) |
SIs made under the Act
| Section | SIs made under the Act |
|---|---|
| S. 4 | National Oil Reserves Agency Act 2007 (Share Transfer) Order 2007 (S.I. No. 155 of 2007) |
| S. 5 | National Oil Reserves Agency Act 2007 (Share Transfer Day) Order 2007 (S.I. No. 566 of 2007) |
| S. 37B(3)(a), (b) | National Oil Reserves Agency Act 2007 (Delegation of Climate Action Fund Grant Payment Functions) Order 2025 (S.I. No. 287 of 2025) |
| National Oil Reserves Agency Act 2007 (Delegation of Climate Action Fund Grant Payment Functions) Order 2022 (S.I. No. 449 of 2022) | |
| S. 44 | National Oil Reserves Agency Act 2007 (Returns and Levy) (Amendment) (No. 2) Regulations 2009 (S.I. No. 220 of 2009) |
| National Oil Reserves Agency Act 2007 (Returns and Levy) (Amendment) Regulations 2009 (S.I. No. 214 of 2009) | |
| National Oil Reserves Agency Act 2007 (Returns and Levy) Regulations 2007 (S.I. No. 567 of 2007) | |
| S. 44D | National Oil Reserves Agency Act 2007 (Advanced Biofuel Obligation Rate) (Revocation) Order 2023 (S.I. No. 692 of 2023) |
| National Oil Reserves Agency Act 2007 (Renewable Transport Fuel Obligation Rate) (Revocation) Order 2023 (S.I. No. 691 of 2023) | |
| National Oil Reserves Agency Act 2007 (Biofuel Obligation Rate) Order 2022 (S.I. No. 21 of 2022) | |
| National Oil Reserves Agency Act 2007 (Biofuel Obligation Rate) Order 2019 (S.I. No. 38 of 2019) | |
| National Oil Reserves Agency Act 2007 (Biofuel Obligation Rate) Order 2018 (S.I. No. 198 of 2018) | |
| National Oil Reserves Agency Act 2007 (Biofuel Obligation Rate) Order 2016 (S.I. No. 225 of 2016) | |
| National Oil Reserves Agency Act 2007 (Biofuel Obligation Rate) Order 2012 (S.I. No. 562 of 2012) | |
| S. 44D(2)(a) | National Oil Reserves Agency Act 2007 (Advanced Biofuel Obligation Rate) Order 2022 (S.I. No. 710 of 2022) |
| National Oil Reserves Agency Act 2007 (Renewable Transport Fuel Obligation Rate) Order 2022 (S.I. No. 709 of 2022) | |
| S. 44G(1B) | National Oil Reserves Agency Act 2007 (Additional Certificates For Renewable Transport Fuel) (Amendment) Regulations 2025 (S.I. No. 247 of 2025) |
| National Oil Reserves Agency Act 2007 (Additional Certificates for Renewable Transport Fuel) Regulations 2023 (S.I. No. 143 of 2023) | |
| S. 44GA | National Oil Reserves Agency Act 2007 (Minimum Percentage Volume of Renewable Transport Fuel in Petrol) Regulations 2023 (S.I. No. 142 of 2023) |
| S. 44J | National Oil Reserves Agency Act 2007 (Biofuel Obligation Buy-out Charge) (Amendment) Regulations 2022 (S.I. No. 225 of 2022) |
| National Oil Reserves Agency Act 2007 (Biofuel Obligation Buy-out Charge) Regulations 2010 (S.I. No. 644 of 2010) | |
| S. 44J(5)(a) | National Oil Reserves Agency Act 2007 (Advanced Biofuel Obligation Buy-out Charge) Regulations 2023 (S.I. No. 44 of 2023) |
| National Oil Reserves Agency Act 2007 (Renewable Transport Fuel Obligation Buy-out Charge) Regulations 2023 (S.I. No. 43 of 2023) | |
| S. 44Q | National Oil Reserves Agency Act 2007 (Returns and Biofuel Levy) (Amendment) Regulations 2020 (S.I. No. 279 of 2020) |
| National Oil Reserves Agency Act 2007 (Returns and Biofuel Levy) Regulations 2010 (S.I. No. 356 of 2010) | |
| S.44T | National Oil Reserves Agency Act 2007 (Returns and Biofuel Levy) (Amendment) Regulations 2020 (S.I. No. 279 of 2020) |
| National Oil Reserves Agency Act 2007 (Returns and Biofuel Levy) Regulations 2010 (S.I. No. 356 of 2010) | |
| S. 44U | National Oil Reserves Agency Act 2007 (Returns and Biofuel Levy) Regulations 2010 (S.I. No. 356 of 2010) |
| S. 44V | National Oil Reserves Agency Act 2007 (Returns and Biofuel Levy) Regulations 2010 (S.I. No. 356 of 2010) |
| S. 44W | National Oil Reserves Agency Act 2007 (Returns and Biofuel Levy) Regulations 2010 (S.I. No. 356 of 2010) |
| S. 59 | National Oil Reserves Agency Act 2007 (Returns and Levy) Regulations 2007 (S.I. No. 567 of 2007) |